Connecting the power supply: Plug the power cord into the AC load bank's power input socket and connect it to the mains outlet.
Connecting the load: Connect the device under test to the load bank's output port. When connecting, ensure that the voltage, frequency, and current parameters of the device under test comply with the load bank's specifications.
Connecting the controller: If the AC load bank is equipped with a controller, connect the controller to the load bank's control port to enable remote control or software-based operation.







